Portal de Alguazas

www.portaldealguazas.com

Alguazas - SpanishAlguazas - English
detail of Alguazas

 

UXA "The plant in Barrio del Carmen begins his work despite opposition from neighbors" (05/09/2011)

The PP begins to roll the new WWTP will attract odors, insects and noise to the residents of Barrio del Carmen.

The vested interests of urban pitch Lladó and have denied the change of location over the opposition of the people.

No demonstrations or collecting signatures, or the neighborhood protests have done nothing to the PP Alguazas retract the construction of new WWTP (Wastewater Treatment Station) within 500 meters of the Barrio del Carmen.

In December 2008, the PP won as the site for construction in Los Quiñones, along with El Colmenar.

First, note that by law the minimum distance to the population is 2 km, and this is less than 500 meters and an area for future expansion and development, highlighting facilities like the football field or the Center entered secondary school, vocational training and primary education, frequented daily by young children.

This treatment plant has capacity for 200,000, and given its proximity to the population, construction affects the development of this area of ​​Barrio del Carmen.

Banana and anti-development policy of the PP Alguazas affect thousands of residents living near the new sewage treatment plant as this will cause odors, attract insects, noise, ... by the proximity of faecal and industrial waste, which will cause significant contamination.

In the full July 28, the spokesman of United for Alguazas, José Gabriel García Bernabé, the mayor asked the date of commencement of works, which ensured that the works would begin in September, after his award was published BORM final in the past July 12, 2011.

The total amount of the new WWTP Alguazas is 9.5 million, contributed by 80% by the Cohesion Fund of the EU, and awarded by public tender for construction companies Dragados SA and GE Electromur Ecocivil and SL .

This new plant will have a treatment capacity of 15,000 cubic meters of water per day, which can get up to 5 hectometres year.

The plant is designed with modern and advanced technologies that include specific tertiary treatment system for reuse of wastewater in agriculture.

From UXA, we want to make clear that we consider an urgent need for infrastructure construction of the sewage, but strongly opposed the siting of it because it lies too close to the population and violates the law.

Unity for Alguazas considers that the treatment plant should be installed in Soto de la Virgen, near the treatment plant and Ceutí Lorquí and away from the town.

What are the hidden interests or urban Lladó pitch when they want to change the location of the sewage even though the EU agree?

What is clear is that the work has already begun on the backs of the neighbors and there is no turning back.

Source: UXA

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información