Portal de Alguazas

www.portaldealguazas.com

Alguazas - SpanishAlguazas - English
detail of Alguazas

 

The new heated pool Alguazas reborn from its ashes (29/01/2013)

the City restart construction of a modern infrastructure

Alguazas recovers illusion.

After the vile sabotage that led to the burning and destruction of the new heated pool in the town on the morning of November 7, 2011, to begin work, the City Council has taken alguaceño reconstruction work of this modern and well equipped municipal infrastructure.

The optimal design of this innovative and Heated well as the materials they will tell their structure make this facility a service keenly awaited by the residents of the population and that, on two vessels, one for the swimming exclusive and one second reduced-size for other applications, offer a wide range of services and benefits.

The heated Municipal give the opportunity to practice, in addition to the traditional swimming, new types of sports like aerobics, swimming for babies and premamás, aqua-aerobics or acuafitness.

It also will implement activities and services such as health or functional recoveries therapeutic swims in the water.

Building a budget that is half the cost of a traditional pool of these features.

The construction of this ambitious and therefore well equipped municipal infrastructure, driven initiative of the Sports Councils and Local Planning Consistory, investment is made with a rational and realistic about costs as it has a budget 50% below what is traditionally the building of a facility of this nature.

Alguazas heated pool, equipped with an elliptical structure and therefore innovative, counts among its building materials with the predominance of plastic wood facing proper waterproofing also projecting its two vessels on the ground rather than on Forged visible.

Using biomass as a renewable energy and 75% less expensive than the traditional ones.

Another advantage offered by this new equipment is Alguazas municipal operation consisting of the use of biomass as a renewable energy, a factor that will allow management and reduced energy costs compared to more traditional energy (up to 75 % savings with targeted alternative energy).

Easy access, located in the sports area of ​​the municipality and ambit completely in the urban local.

As for the location of the new heated pool, has chosen a central easily accessible from all parts of the municipality.

As pointed Alguazas Mayor Jose Antonio Fernandez Lladó, "is in an ideal location to be adjacent to the Municipal Sports Pavilion and ambit completely in the urban core."

Thus, stresses the mayor, "the sports facilities are centralized in a single physical location."

A truncated sleep beginning to take shape and become a reality for the enjoyment of residents and service.

In short, and as noted by the Town Planning Alguazas Consistory, Francisco Javier García Gambín, "the countdown has begun to revive and be realized once and for all sleep treacherously alguaceños-truncation of the count representing A heated pool open to the enjoyment and benefit of all neighbors. "

Source: Ayuntamiento de Alguazas

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información