Alguazas City Council established a priority action on the streets of the Barrio del Carmen de Alguazas, due to the significant drop presented.
They will be wearing course is improved by applying a hot asphalt mix D12, across the width of the road.
This type of mixture is very suitable for this type of reinforcement in urban road traffic medium or low.
It is a very flexible type of mix with good rheological behavior and generates a considerable reduction of noise generated by road traffic in residential areas.
The Works and Services Plan, 2008 is entirely devoted to this action in the Barrio del Carmen and has a budget of € 205,121, the Presidential funding through the General Directorate of Local Government with 90% and the City of Alguazas with the remaining 10%.
In total there will be 4.5 miles of streets in the Barrio del Carmen Alguazas which will completely renovated their firm.
Source: Ayuntamiento de Alguazas